Configure and automate Home Assistant with Claude, ChatGPT, and other AI assistants.
Andare Homes Tools is installed from its publisher's own source and answers where it runs, so this marketplace is not in the path of a single call. There is no address here to send one to, and a panel that pretended otherwise would be showing you an answer we made up. Install it and call it from your own client — the Installation tab has the entry for each one.
What it does
Planning calculators for custom homes, additions and major renovations.
Quickstart
# 1 — add it to Claude Code
claude mcp add --scope user --transport http andare-homes-tools-mcp https://andarehomes.com/mcp
# 2 — ask your agent for something these tools do
# toronto-building-permit-checker, garden-suite-zoning-checker, toronto-permit-review-time-calculator and 8 more
Andare Homes Tools costs nothing on mcprush: there is no plan to choose here, no cap to set and nothing mcprush can bill you for.
Collected from a public index. Nobody has claimed this account, so nothing here was written by its author — claim it if it is yours.
Where are you running it?
Every route below installs the same thing and ends at the same approval screen. Nothing here runs on your machine and nothing runs on ours: this server answers at its publisher’s own address, and what you install is the connection straight to it.
This is a public server: it answers at its publisher’s own address and this marketplace is not in the path. Claude Code registers it in one command; --scope user makes it available in every project. The transport below is http, as the publisher's own manifest declares it.
claude mcp add --scope user --transport http andare-homes-tools-mcp https://andarehomes.com/mcpReconnect, or start a new session, and the tools appear in the model’s tool list.
One config entry pointing straight at the publisher’s own address — this marketplace is not in the path, and nothing from this listing executes on your machine.
11 tools, with what each one reads, writes and reaches shown before you agree — the same list on every route above. Read the tool surface.
Tool surface
What the model actually sees. Descriptions are diffed on every release — see version history.
Says whether a project in Toronto needs a building permit, usually does not, or depends, with the City source for the answer. Preliminary planning only. Example: /api/tools/toronto-building-permit-checker?project=deck&h=high&att=yes&exit=no
| Parameter | Type | Required | Notes |
|---|---|---|---|
| project | string | yes | What is being built |
| suite | string | no | basement: Will the work create a second suite or any additional dwelling unit? |
| struct | string | no | basement: Will it include structural or material alterations, such as adding or removing walls, excavation, underpinning or a new basement entrance? | roofing: Will the work include any structural rep |
| mech | string | no | basement: Will it include new plumbing or heating work? |
| h | string | no | deck: How high will the finished deck level be above the adjacent finished grade? |
| att | string | no | deck: Will the deck be attached to the house? | shed: Will it be attached to a house, garage or any other structure? |
| exit | string | no | deck: Will it have a roof, or will it be part of a required exit from the house? |
| lb | string | no | wall: Is the wall load bearing? |
| kind | string | no | opening: What is the work? | plumbing: What is the plumbing work? |
| bt | string | no | opening: What kind of building is it? |
| chg | string | no | opening: Will the work affect the structural support or create a new exit? |
| plumb | string | no | kitchen: Will you add or move plumbing, such as relocating a sink, shower, tub, toilet or drain? | shed: Will it have plumbing? |
| walls | string | no | kitchen: Will you add or remove any walls or change any openings? |
| scope | string | no | kitchen: Is the work limited to replacing cabinets, counters, finishes and fixtures in the same locations? |
| size | string | no | shed: What is the gross floor area? |
| pool | string | no | fence: Is the fence a swimming pool enclosure? |
| where | string | no | fence: Where will the fence be? |
| ht | string | no | fence: How tall will it be? |
Checks height, separation, floor area, setbacks and lot coverage of a garden suite against Toronto By-law 849-2025. Preliminary planning only. Example: /api/tools/garden-suite-zoning-checker?zone=yes&laneway=no&lot_area=400&lot_depth=40&lot_frontage=10&house_gfa=180&house_footprint=90&ancillary_footprint=40&suite_height=4&separation=5&suite_gfa=50&rear_setback=2&side_setback=1.5&one_storey=yes&rea
| Parameter | Type | Required | Notes |
|---|---|---|---|
| zone | string | yes | Property is in a residential zone (R, RD, RS, RT, RM) |
| laneway | string | yes | Property abuts a public laneway |
| lot_area | number | yes | Lot area (m2) |
| lot_depth | number | yes | Lot depth (m) |
| lot_frontage | number | yes | Lot frontage (m) |
| house_gfa | number | yes | House gross floor area, all floors (m2) |
| house_footprint | number | yes | House footprint (m2) |
| ancillary_footprint | number | yes | Footprint of all ancillary buildings together, including the suite (m2) |
| suite_height | number | yes | Suite height from average grade (m) |
| separation | number | yes | Distance from the main wall of the house (m) |
| suite_gfa | number | yes | Suite gross floor area, all floors including a basement (m2) |
| rear_setback | number | yes | Rear yard setback (m) |
| side_setback | number | yes | Smallest side yard setback (m) |
| one_storey | string | yes | Suite is one storey |
| rear_openings | string | yes | Rear lot line abuts a residential-zone lot and the rear wall has openings more than 4.0 m above grade |
| side_openings | string | yes | Side wall facing a side lot line (not a street) has doors or windows |
Gives the last day of the City of Toronto published review time for a complete building permit application, by review stream. Preliminary planning only. Example: /api/tools/toronto-permit-review-time-calculator?stream=house&date=2026-12-01&zoning_certificate=yes
| Parameter | Type | Required | Notes |
|---|---|---|---|
| stream | string | yes | Review stream: house = House Stream (10 business days); small = Small Building Stream (15); large = Large and Complex, large building (20); complex = Large and Complex, complex building (30); express |
| date | string | yes | Date the complete application is taken in (YYYY-MM-DD) |
| zoning_certificate | string | yes | Application includes an issued Zoning Applicable Law Certificate and all fees paid |
Ramp length for a rise at the Ontario Building Code 1 in 12 gradient, a slope check, or a doorway clear width check, using Section 3.8. Preliminary planning only. Example: /api/tools/accessible-ramp-and-doorway-calculator?mode=len&units=mm&rise=600
| Parameter | Type | Required | Notes |
|---|---|---|---|
| mode | string | yes | len = ramp length needed for a rise (needs rise); slope = check an existing slope (needs rise and run); door = doorway clear width (needs width and door) |
| units | string | no | Units of rise, run and width |
| rise | number | no | Total rise (modes len and slope) (units) |
| run | number | no | Horizontal run (mode slope) (units) |
| width | number | no | Clear width with the door open (mode door) (units) |
| door | string | no | Which doorway (mode door): path = barrier-free path of travel; suite-wide = bathroom or bedroom door in a suite served by a corridor 1,060 mm or wider; suite-narrow = same, corridor narrower than 1,06 |
Minimum bathroom exhaust fan rating in CFM from room size, ceiling height and fixtures, using the Home Ventilating Institute guidance. Preliminary planning only. Example: /api/tools/bathroom-exhaust-fan-calculator?units=ft&length=8&width=10&height=8
| Parameter | Type | Required | Notes |
|---|---|---|---|
| units | string | no | Units of length, width and height |
| length | number | yes | Room length (units) |
| width | number | yes | Room width (units) |
| height | number | no | Ceiling height (units) |
| fixtures | string | no | Comma separated fixtures in the room; needed only when the room is over 100 sq ft |
Tests basement ceiling height, height under beams and ducts, and stair headroom against Ontario Building Code Part 9, for a house basement or a secondary suite. Window sizes are tested by the egress window size calculator. Preliminary planning only. Example: /api/tools/basement-ceiling-height-and-egress-checker?units=mm&type=suite&ceiling=2000&obstruction=1900&stair=1980
| Parameter | Type | Required | Notes |
|---|---|---|---|
| units | string | no | Units of every height |
| type | string | yes | house = basement of a house without a secondary suite; suite = secondary suite |
| ceiling | number | yes | Finished ceiling height over the main part of the space, floor to underside of the finished ceiling (units) |
| share | number | no | house only: percent of the basement floor area with a ceiling of 2,100 mm or more (default 100 when the ceiling is 2,100 mm or more, otherwise 0) (%) |
| obstruction | number | no | Lowest clear height under a beam or duct (units) |
| bedroom | string | no | house only: a bedroom is planned in the basement |
| bedroom_low | number | no | house with bedroom only: lowest ceiling in the bedroom (units) |
| bedroom_share | number | no | house with bedroom only: percent of the required bedroom floor area with a ceiling of 2,300 mm or more (%) |
| stair | number | no | Clear height over the basement stair, measured from the line through the tread nosings (units) |
Tests a bedroom escape window against Ontario Building Code Article 9.9.10.1: open area of at least 0.35 m2, no dimension under 380 mm, sill height and window well clearance. Preliminary planning only. Example: /api/tools/egress-window-size-calculator?units=mm&type=casement&width=600&height=700&floor=basement&well=yes&well_clearance=600
| Parameter | Type | Required | Notes |
|---|---|---|---|
| units | string | no | Units of width, height, sill and clearance |
| type | string | yes | Window type |
| width | number | yes | Clear width of the unobstructed open portion with the window fully open (units) |
| height | number | yes | Clear height of the unobstructed open portion with the window fully open (units) |
| floor | string | yes | basement = window in a basement area; above = any other floor |
| sill | number | no | Sill height above the floor (tested only when floor is above) (units) |
| well | string | no | The window opens into a window well |
| well_clearance | number | no | Clearance in front of the window inside the well (units) |
A checklist of Ontario Building Code, Planning Act, Fire Code and City of Toronto items to check before adding a secondary suite to a house, each with its section number. Preliminary planning only. Example: /api/tools/second-suite-requirements-checklist?building=detached&smaller=yes&units_now=1&location=basement&fuel=yes&parking=one&rental=yes
| Parameter | Type | Required | Notes |
|---|---|---|---|
| building | string | yes | Existing building type |
| smaller | string | yes | The new unit will be smaller than the main unit |
| units_now | string | yes | Dwelling units in the house now |
| location | string | yes | Where the suite will be |
| fuel | string | yes | A fuel-burning appliance, flue, fireplace or attached garage is in or next to the suite |
| parking | string | yes | Parking spaces available for the suite |
| rental | string | yes | The suite will be rented |
Says whether a deck in Toronto needs a building permit, whether a guard is required, the minimum guard height, opening size and stair handrail rule, from the City of Toronto and Ontario Building Code Part 9. Preliminary planning only. Example: /api/tools/deck-permit-and-guard-checker-toronto?units=mm&height=900&attached=yes&roofed=no&exit=no&risers=4&guard_height=900&gap=90
| Parameter | Type | Required | Notes |
|---|---|---|---|
| units | string | no | Units of height, guard height and gap |
| height | number | yes | Height of the finished deck surface above the adjacent finished grade (units) |
| attached | string | yes | The deck is attached to the house |
| roofed | string | yes | The deck has a roof |
| exit | string | yes | The deck forms part of an exit required under the Building Code |
| risers | number | no | Number of risers on the deck stairs (whole number) |
| guard_height | number | no | Planned guard height (units) |
| gap | number | no | Planned clear opening between pickets or balusters (units) |
Gives the number of risers allowed for a total rise, the rise and run of each option, and tests headroom and width against Ontario Building Code Part 9 Section 9.8. Preliminary planning only. Example: /api/tools/stair-calculator-ontario?units=mm&type=private&rise=2600&run=3500&headroom=1980&width=900
| Parameter | Type | Required | Notes |
|---|---|---|---|
| units | string | no | Units of rise, run, headroom and width |
| type | string | no | private = stairs inside or outside a house or dwelling unit; public = public stairs in a residential building |
| rise | number | yes | Total rise from finished floor to finished floor (units) |
| run | number | no | Total horizontal run available (units) |
| headroom | number | no | Clear height over the stair (units) |
| width | number | no | Stair width (units) |
How much paint, how many drywall sheets or how many boxes of flooring a rectangular room needs, with an adjustable waste allowance. Quantities only. Preliminary planning only. Example: /api/tools/renovation-materials-calculator?material=paint&units=ft&length=12&width=10&height=8&openings=40&coats=2&coverage=350
| Parameter | Type | Required | Notes |
|---|---|---|---|
| material | string | yes | What to calculate |
| units | string | no | ft = feet, sq ft and gallons; m = metres, m2 and litres |
| length | number | yes | Room length (units) |
| width | number | yes | Room width (units) |
| height | number | no | Ceiling height (paint and drywall) (units) |
| openings | number | no | Doors and windows to subtract (paint and drywall) (area in sq ft or m2) |
| ceiling | string | no | Include the ceiling (paint and drywall) |
| coats | number | no | Number of coats (paint) |
| coverage | number | no | Coverage printed on the paint can (paint) (sq ft per gallon or m2 per litre) |
| sheet | string | no | Drywall sheet length in feet, 4 ft wide (drywall) |
| box_coverage | number | no | Coverage printed on one box of flooring (floor) (sq ft or m2) |
| waste | number | no | Waste allowance in percent (drywall and floor) (%) |
- Every tool — any call limit is its publisher’s, not ours
- No card, and mcprush charges nothing for it
- Runs at its publisher’s own address — this marketplace is not in the path
- Nothing to cap, because mcprush bills nothing
What counts against your monthly calls
| Tool | Unit | Calls used | Out of the allowance |
|---|
Nothing here is billable: mcprush charges nothing to install Andare Homes Tools or to call it, at any volume.
Two independent axes, because powerful and malicious are different questions. The grade is threat only. The capability level is blast radius, and it is never a penalty on the grade — it is priced as one subtract-only term in the score, where you can see it.
| Term | Level | What it prices | Points |
|---|---|---|---|
| capability-exposure | minimal | capability blast radius (minimal) — client exposure if the model is manipulated | −0 |
| coverage-honesty | manifest | inspection depth (manifest) — how much of the target the scan could see | −4 |
What the scan could actually read
A grade is only as meaningful as its coverage, so the scanner publishes its own depth before it publishes its result.
The scan read each tool’s name, description, input schema and annotations exactly as the server listed them the last time it answered us; no code was reviewed. We ask the server again about once a month, and a list that changed is graded again.
The implementation source was not read — this reflects the declared tool metadata only.
Capability — what it could do if the model were manipulated
Tags derived from each tool’s schema and the implementation, not from what the tool calls itself. minimal is the level these add up to.
| Tool | Capability tags | Why the tag was assigned |
|---|---|---|
| toronto-building-permit-checker | no tags | |
| garden-suite-zoning-checker | no tags | |
| toronto-permit-review-time-calculator | no tags | |
| accessible-ramp-and-doorway-calculator | no tags | |
| bathroom-exhaust-fan-calculator | no tags | |
| basement-ceiling-height-and-egress-checker | no tags | |
| egress-window-size-calculator | no tags | |
| second-suite-requirements-checklist | no tags | |
| deck-permit-and-guard-checker-toronto | no tags | |
| stair-calculator-ontario | no tags | |
| renovation-materials-calculator | no tags |
Toxic-flow graph
The lethal trifecta, checked as a graph rather than as a checklist: untrusted input, a sensitive source and an external sink have to meet before there is a path worth worrying about.
The public result for this release does not print the flow graph, so there is nothing to show here. That is not the same as "no paths were found": what the scan did read is above, under coverage.
Supply chain and provenance
This is the first scan of this surface here, so there is nothing yet to compare it against.
Every result on this tab comes from one deterministic pass over the published package — offline, rule by rule, and auditable line by line above. Same methodology version, same bytes, same score.
Release history
This is an address its publisher runs: which release it serves is theirs to choose, so there is nothing here to pin. The history below is for reading; the current release on file is 1.0.0.
No release note was published with this version.
One review per account, from a signed-in account that does not publish this listing. Nothing else is asked — you can say what you think before you install it. Publishers can reply once per review, and a review can be edited or deleted by whoever wrote it.
Any signed-in account that does not publish Andare Homes Tools can review it, once — before installing it or after. A review from an account that has installed it is marked as one.
Nobody has reviewed this listing. The rating on the card is the mean of the reviews written here and nothing else, so there is no rating until somebody writes the first — which takes a signed-in account that does not publish it, and nothing else.